Supply of electrical equipment for the hydroelectric plant in la muela II
Trabajo realizado:
Documentation of engineering, construction and trials in the fabric of the following equipment of Low and Medium Voltage for the hydroelectric plant La Muela II, who´s client is Iberdrola Generación S.A.U.:
The hydroelectric plant La Muela II, in the province of Valencia, is part of Aprovechamiento Hidroeléctrico de Cortes – La Muela, together witht the plants of La Muela I and Cortes II. The pumped-storage plant La Muela II uses water intakes from the superior deposit of La Muela and from the dam of Cortes built on a first stage. It consists of an underground plant that counts with four equal reversable groups (groups 4, 5, 6 and 7) with a total power of 712 MW of pumping and 852MW in turbination.
Work done:
Documentation of engineering, construction and trials in the fabric of the following equipment of Low and Medium Voltage for the hydroelectric plant La Muela II, who´s client is Iberdrola Generación S.A.U.:
The hydroelectric plant La Muela II, in the province of Valencia, is part of Aprovechamiento Hidroeléctrico de Cortes – La Muela, together witht the plants of La Muela I and Cortes II. The pumped-storage plant La Muela II uses water intakes from the superior deposit of La Muela and from the dam of Cortes built on a first stage. It consists of an underground plant that counts with four equal reversable groups (groups 4, 5, 6 and 7) with a total power of 712 MW of pumping and 852MW in turbination.
Proyecto realizado por Pine
IBERDROLA
Energetic
Valencia, Spain
2013
IBERDROLA
Valencia, Spain
Energetic
2013