Work done:
Fabrication and assembly of thermo-solar power plant of 4.224 SCE. The set-up includes the ship of pre-setting of previous elements to the assembly.
Pre-setting and assembly of SCE, pre-setting and assembly of Pylons, assembly of engines, pre-setting and assembly of pipes HCE, pre-setting and assembly of crossover, ball-joints and liras.
14.000 Tn of structure and 60.000 inches of installed pipes.
Work Done:
Fabrication and assembly of thermo-solar power plant of 4.224 SCE. The set-up includes the ship of pre-setting of previous elements to the assembly.
Pre-setting and assembly of SCE, pre-setting and assembly of Pylons, assembly of engines, pre-setting and assembly of pipes HCE, pre-setting and assembly of crossover, ball-joints and liras.
14.000 Tn of structure and 60.000 inches of installed pipes.
Project made by Daorje
IBERDROLA
Energetic
Puertollano, Spain
2008
IBERDROLA
Puertollano, Spain
Energetic
2008