About This Project

Supply, fabrication and assembly of the cement plant of CEMEX

Project made by Daorje

 Work done:

Supply, fabrication and assembly of cement plant in Andorra-Teruel, including the tower of the interchange, mill for oil and bagging machine.

Tower of the interchanger: supply, fabrication and assembly of steel structures, conducts, pipes and equipment installation (including calciner, lifting devices, cyclones, drops in oil, fans and control pipes).

Oil Mill (conducts, tapes, lifting devices, mills, hoppers, hydraulic systems, filters) and bagging machine (hoppers, filters, tapes, lifting devices)-

8.000 Tn and 40.000 inches.

 Work done:

Supply, fabrication and assembly of cement plant in Andorra-Teruel, including the tower of the interchange, mill for oil and bagging machine.

Tower of the interchanger: supply, fabrication and assembly of steel structures, conducts, pipes and equipment installation (including calciner, lifting devices, cyclones, drops in oil, fans and control pipes).

Oil Mill (conducts, tapes, lifting devices, mills, hoppers, hydraulic systems, filters) and bagging machine (hoppers, filters, tapes, lifting devices)-

8.000 Tn and 40.000 inches.

Project made by Daorje

Client

CEMEX

Sector

Cement maker

Location

Teruel, España

Date

2008

Client

CEMEX

Location

Teruel, Spain

Sector

Cement maker

Date

2008

 Other related projects