Work done:
Supply, fabrication and assembly of cement plant in Andorra-Teruel, including the tower of the interchange, mill for oil and bagging machine.
Tower of the interchanger: supply, fabrication and assembly of steel structures, conducts, pipes and equipment installation (including calciner, lifting devices, cyclones, drops in oil, fans and control pipes).
Oil Mill (conducts, tapes, lifting devices, mills, hoppers, hydraulic systems, filters) and bagging machine (hoppers, filters, tapes, lifting devices)-
8.000 Tn and 40.000 inches.
Work done:
Supply, fabrication and assembly of cement plant in Andorra-Teruel, including the tower of the interchange, mill for oil and bagging machine.
Tower of the interchanger: supply, fabrication and assembly of steel structures, conducts, pipes and equipment installation (including calciner, lifting devices, cyclones, drops in oil, fans and control pipes).
Oil Mill (conducts, tapes, lifting devices, mills, hoppers, hydraulic systems, filters) and bagging machine (hoppers, filters, tapes, lifting devices)-
8.000 Tn and 40.000 inches.
Project made by Daorje
CEMEX
Cement maker
Teruel, España
2008
CEMEX
Teruel, Spain
Cement maker
2008